Drop us a line, or give us a heads up if you're interested in meeting with us.
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
W: Logan Architects Atelier
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
E: contact@loganarchitectsatelier.com
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
P: (573) 310-8686 tel
▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬
Feasibility Call ►
Investigated several proposed lighting schemes and their impact on the historic integrity of this national monument. Several lighting fixtures proposed were not appealing from vantage points throughout the St. Louis region ...
Project included re-decking of the upper portion of the bridge for vehicular and pedestrian traffic along with the addition of a bike trail to the Illinois side of the Mississippi River ...
Periodic site visits to the gymnasium were performed, to assist the National Park Service in assessing the physical condition and the historic integrity of the building’s materials, features and spaces. Reports were forwarded to the NPS ...
— Le Corbusier —